Planning, process & cost
How to brief a carpenter so the quote is actually accurate
Most price changes mid-job trace back to something not known at quoting stage.

A quote is only as accurate as the information behind it. When a price moves during a job, it is almost always because a decision was still open at the start — the exact appliance, the wall construction, the finish level — and the assumption made turned out to be the wrong one. A good brief closes those gaps early, and it also gives you a fair basis to compare quotes from different trades.
What to send before a visit
Even for a site visit, this information speeds everything up and improves the initial guidance.
- Wide photos of the whole room, plus close-ups of anything unusual.
- Key dimensions — width, height, depth, and ceiling height where relevant.
- What the walls and floor are made of, if you know.
- Any products already chosen, with model numbers.
- Access notes: parking, stairs, narrow doorways, or restricted working hours.
The decisions worth making early
Finish level, ironmongery, appliance and fireplace models, and whether you want the work painted or left ready for a decorator. These are the variables that change the labour, and settling them upfront is what keeps a quote from turning into an estimate.
Ask what's excluded
Comparable quotes need comparable scope. Electrics, plastering, decoration, waste removal and making good are the usual boundaries, and every trade draws them slightly differently. Ask explicitly rather than assuming.
Sequencing with other trades
If electricians, plasterers or tilers are involved, the order matters and so do the gaps between them. Agreeing that sequence at quoting stage prevents the most common cause of delay — a trade arriving before the previous stage is genuinely ready.
Questions we're asked about this
Ready to get a quote?
Send photos, dimensions and any product choices you've made and we'll come back with a clear scope and a fixed price.
Get a free quote
Reply within 24 hours - No obligation